Why the pipes cost you your policy
Polybutylene pipe was installed in many houses between the 1970s and 1990s, and it's known to fail from the inside, breaking down where it contacts chlorine in the water supply. Insurers have seen enough burst-pipe claims from it that many now treat the material itself as the reason to drop a house or deny new coverage, not any claim you filed. If your non-renewal letter mentions the plumbing, or an inspection flagged gray or blue plastic pipe at the water heater or under sinks, that's almost certainly it. Some insurers will still cover the house if you've repiped with copper or PEX, so get documentation of that work if it's done. If it isn't, expect fewer insurers willing to write the policy, and plan on a plumbing inspection before anyone quotes you again.

Insurers who still write policies for houses with polybutylene pipe don't all price the risk the same way, and some won't touch it while others will with the right inspection report. One may ask more for the same dwelling coverage, another may decline outright. Since your deadline is fixed by that letter, checking what's available now tells you whether you're looking at a higher price or a real alternative.
What a plumbing inspection for polybutylene actually checks
An inspection ordered because of polybutylene pipe is not the same as a general home inspection. The plumber or inspector is looking for the pipe itself, usually gray or sometimes white or blue, running to the water heater, under sinks, and at the main shutoff. They'll also check the fittings, since polybutylene often fails at the plastic or metal connectors before the pipe itself gives out. If any of it is still in place, that goes in the report, and the insurer decides from there whether to write the policy, charge more for it, or decline.
Full repiping removes the risk entirely, but it's not the only outcome insurers will accept. Some houses have had partial repiping, copper or PEX run to the fixtures most likely to leak while some polybutylene stays in walls or slab where replacing it would mean tearing out drywall or concrete. Whether that's enough depends on the insurer. A few will cover a partially repiped house if the inspection shows the remaining pipe is in a low-risk spot. Others want it all out before they'll quote anything.
If the repiping was done years ago, the documentation matters as much as the work itself. A permit, a paid invoice from a licensed plumber, or a prior inspection report showing copper or PEX throughout gives the insurer something to act on. Without it, some will send their own inspector before quoting regardless of what a homeowner says was done, since the cost of being wrong about a pipe that leaks inside a wall falls on them.
None of this is standard across insurers, which is part of why the requirement feels inconsistent from one quote to the next. One company might accept a plumber's letter stating the pipe was replaced. Another might require a specific inspection form, or decline the house anyway until a full repipe is complete. The declarations page from a previous policy won't say which kind of insurer is on the other end of a new application, and the only way to find out is to have the repiping documentation ready and see what each one asks for next.

What repiping actually costs and whether it's worth it before you shop
Repiping a house is not cheap, and the price depends on how much of the house still has polybutylene and how hard it is to reach. A house with an accessible crawlspace or basement costs less to repipe than one on a slab, where plumbers have to open walls or cut concrete to get at the lines. Get a few quotes from licensed plumbers before deciding, since the spread between them is often larger than people expect, and ask specifically whether the quote covers full repiping or just the fixtures most likely to fail.
Before paying for a full repipe, it's worth finding out what the insurers in your area actually require. If one will write a policy on a partial repipe with the right inspection report, spending the extra money to pull pipe out of a slab might not change your options or your price. A plumber can tell you what's there and where, but they can't tell you what an insurer will accept. That's a separate question, and the answer varies enough that it's worth checking before committing to the larger job.
If the house is older and has other things insurers flag, aging roof, outdated wiring, a prior claim, repiping solves the plumbing problem but not the rest of it. Some non-renewal letters list more than one reason, even when the plumbing is the one that stands out. Read the letter again for anything else mentioned, because fixing the pipes and then getting declined over the roof is the kind of thing that wastes both the money and the time before a deadline.
Timing matters more than it seems like it should. A repipe takes days to a couple of weeks depending on the size of the house, and insurers won't quote off a work order or a job in progress. They want it finished, inspected if the local permit process requires that, and documented. If the non-renewal deadline is close, it may not be possible to finish the work and get a new policy in place before coverage lapses, which is its own reason to find out early what an insurer will accept short of a full repipe.

Before the deadline on that letter
Check whether any repiping was documented with a permit or invoice, and have it ready. If none was done, find out what an inspection would show before you commit to the cost of replacing the pipe.